Selected Projects
A selection of underground projects undertaken by Mr Eden M. Almog-Goldreich.
Wareham Dam Spillway Replacement
- Employer
- Kiewit Engineering Group Canada
- Location
- Mayo, Yukon, Canada
- Client
- Wareham Hydroelectric Dam
- Role
- Discipline Lead – Underground; Engineer of Record for excavation and rock support
- Dates
- October 2025 – December 2026
BART Silicon Valley Phase II, CP2
- Employer
- Kiewit Engineering Group Canada
- Location
- San Jose, California, USA
- Client
- Valley Transportation Authority
- Role
- Property Protection and Instrumentation and Monitoring Discipline Lead
- Dates
- February 2022 – December 2026
- Scope
- $3.5B light-rail project with a 5-mile underground section, large-diameter bored tunnel, shafts and stations
Trans Mountain Expansion Project
- Employer
- Kiewit Engineering Group Canada
- Location
- British Columbia, Canada
- Client
- Trans Mountain
- Role
- Tunnel Designer for two 4.5 m diameter, 400 m long drill-and-blast rock tunnels
- Dates
- December 2021 – May 2022
Edmonton Valley Line LRT
- Employer
- Arup USA
- Location
- Edmonton, Alberta, Canada
- Role
- Lead temporary and permanent works designer for a 500 m twin-bored SEM tunnel
- Dates
- 2016 – 2021
- Scope
- Shallow tunnels beneath a major live road through soft clays, glacial tills and weak rock
Mount Dennis Tunnel – Eglinton Crosstown West Extension
- Employer
- Arup Canada
- Location
- Toronto, Ontario, Canada
- Client
- Metrolinx
- Role
- Discipline Tunnel Lead for the reference design and project specifications
- Dates
- 2020 – 2021
Ashbridges Bay Connection Tunnels
- Employer
- Arup Canada
- Location
- Toronto, Ontario, Canada
- Role
- Tunnel Lead and Engineer of Record
- Dates
- 2021
- Scope
- Temporary and permanent support for twin wastewater connection tunnels with cast-in-place Pneumatically Applied Concrete lining in Georgian Bay Shale
Great Lakes Tunnel Project
- Employer
- Arup Canada
- Location
- Michigan, USA
- Role
- Tunnel Engineer
- Dates
- 2020 – 2021
- Scope
- Design and review of precast concrete tunnel lining and TBM performance assessment for a pipeline tunnel beneath Lake Michigan
STM Blue Line Extension Excavation Method Study
- Employer
- Arup Canada
- Location
- Montreal, Quebec, Canada
- Role
- Technical Lead
- Dates
- 2020
- Scope
- Excavation-method study for a proposed 5.8 km tunnel, five underground stations and six auxiliary shafts
Silicon Valley Clean Water Line
- Employer
- Arup Canada
- Location
- San Francisco, California, USA
- Role
- Tunnel Engineer
- Dates
- 2019 – 2020
- Scope
- Temporary works design for TBM launch-shaft adits connecting to a 3.3-mile gravity pipeline in a 15 ft outside-diameter segmentally lined tunnel
ADM Metro Station and REM Tunnel
- Employer
- Arup Canada
- Location
- Montreal, Quebec, Canada
- Client
- Aeroports de Montreal
- Role
- Design Manager for the underground station; third-party reviewer for the REM tunnel
- Dates
- 2017 – 2020
- Scope
- Mined cavern, access shaft and auxiliary tunnels with vibration assessment for drill-and-blast excavation
Confederation Line Extension Project Bid
- Employer
- Arup Canada
- Location
- Ottawa, Ontario, Canada
- Role
- Tunnel Lead
- Dates
- 2018 – 2019
- Scope
- Tender design for approximately 3.5 km of cut-and-cover light-rail tunnels beneath existing infrastructure in mixed ground
Central Bayside System Improvement
- Employer
- Arup USA
- Location
- San Francisco, California, USA
- Role
- Technical Reviewer
- Dates
- 2017
- Scope
- Review of seismic soil-structure interaction and geotechnical design for a 24 ft diameter tunnel, retrieval shaft and deep pump station
New Mexico City Airport Station Box
- Employer
- Arup USA
- Location
- Mexico
- Role
- Independent Checker
- Dates
- 2017
- Scope
- 3D soil-structure interaction check of a proposed deep station-box structure in soft soils under seismic loading
Second Narrows Seismic Review
- Employer
- Arup USA
- Location
- Vancouver, British Columbia, Canada
- Role
- Independent Checker
- Dates
- 2017
- Scope
- Seismic design review of a water tunnel and twin shafts using nonlinear time-history soil-structure interaction modelling
East Side Access: Summer Slab Check
- Employer
- Arup USA
- Location
- New York, New York, USA
- Role
- Independent Checker
- Dates
- 2017
- Scope
- Soil-structure interaction assessment of a jacked-box tunnel beneath a major live rail track
Shatin to Central Link, Contract 1103
- Employer
- Arup UK
- Location
- Hong Kong, China
- Role
- Tunnel Engineer for the design and analysis of 2.5 km of segmental-lined rail tunnels
- Dates
- 2014 – 2015
- Scope
- Twin bored tunnels, complex openings, sprayed concrete lining and high-water-pressure ground conditions
York Potash Mineral Transport Tunnel
- Employer
- Arup UK
- Location
- Yorkshire, United Kingdom
- Role
- Tunnel Engineer
- Dates
- 2015
- Scope
- Feasibility study for a 37.5 km, 6 m diameter mineral transport tunnel and deep shaft system
High Speed 2 – PAS 8810 Tunnel Lining Code
- Employer
- Arup UK
- Location
- United Kingdom
- Client
- High Speed 2 and the British Standards Institution
- Role
- Technical Author
- Dates
- 2016 – 2017
- Scope
- Ground-structure interaction analysis and concrete lining design methodology for the tunnel lining code of practice
BHPB Jansen Project Mineshaft Design
- Employer
- Arup UK
- Location
- Saskatchewan, Canada
- Role
- Technical Reviewer
- Dates
- 2014 – 2017
- Scope
- Review of 8 m diameter, 500 m deep service and production mineshafts, including tubbing support and shaft-interaction modelling
Office for Nuclear Regulation – ABWR Review
- Employer
- Arup UK
- Location
- United Kingdom
- Role
- Technical Reviewer
- Dates
- 2015 – 2016
- Scope
- Review of tunnels, foundations and soil-structure interaction modelling for a proposed nuclear power station, including underground marine works
Western Deep Sewer Mitigation Works
- Employer
- Arup UK
- Location
- London, United Kingdom
- Role
- Project Manager / Tunnel Engineer
- Dates
- 2013 – 2015
- Scope
- Innovative stainless-steel strap system protecting a sewer tunnel beneath a proposed 14 m deep basement excavation
M6/M60 Tunnel Portals Remediation Works
- Employer
- Arup UK
- Location
- Hungary
- Role
- Independent Tunnel Field Engineer
- Dates
- 2011 – 2013
- Scope
- Remediation of backfilled motorway tunnel portals using earth unloading and compaction grouting under live traffic
Express Rail Link, Contract 820
- Employer
- Arup UK
- Location
- Hong Kong, China
- Role
- Tunnel Engineer
- Dates
- 2010 – 2012
- Scope
- Design of NATM/SEM cross passages and TBM segmental lining openings between twin bored tunnels
CERN/Fermilab Linear Collider Studies
- Employer
- Arup UK
- Location
- CERN, Switzerland
- Client
- CERN and Fermilab
- Role
- Project Manager / Tunnel Engineer
- Dates
- 2013 – 2014
- Scope
- Studies of underground caverns up to 30 m span and excavation-disturbed-zone effects on detector support systems
Elizabeth Line (Crossrail), C122
- Employer
- Arup UK
- Location
- London, United Kingdom
- Role
- Numerical Analysis Engineer on the damage assessment team
- Dates
- 2009 – 2010
- Scope
- Multi-stage 3D soil-structure models for station excavations, portals and twin bored tunnels
← Back to Home